Taking on this job allowed our workers to put their skills to the test. This job took us approximately two weeks to finish. For a busy, 24-7 lot, a smart phasing plan needs to be established, allowing the safe operation of the store while efficiently completing the work in sections. Thanks to our team of experts, we were able to seamlessly get the job done.
This is a perfect example of our ability to handle large scale projects with ease. St Leo’s Church was a complete mill of all existing asphalt, a fine grade stone subbase being added and 3 inches of top coat. From there a complete restripe of the parking lot to spec. This job consisted of over 100,000 square feet of area. The end results turned out beautiful for the customer!
This job is a great example of all the services we provide in action. We completed a full lot make-over. We performed an entire mill and overlay of the existing lot, a full spray and re-seal, rebuilt two drain basins, parged inside and out all other drains, widen asphalt in three areas, and laid new stenciling for stripping.